http://www.roofrepair101.org/ – Full hands-on demonstration of how to install IKO Laminated Roof Shingles, on a properly prepared roof deck.

ROOFING: How To Install Laminated Asphalt Shingles

| Green Roofs | 3 Comments
About The Author
-

3 Comments

  • kim sutton
    Reply

    Thanks for the tip about the nail just above the tack strip. Makes sense. Do you still use a starter strip when going over a first layer?

  • 825bayshore
    Reply

    installed the leading wrong! The nail was placed at the top which will not prevent the winding from blowing up the first six inches. The nail goes just above the tack strip to hold down the edge.

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>