More at http://www.greengarage.ca/
Day 1 of installing the waterproofing for the green roof garage. First down is a layer of 1/4″ Dens-Deck, then the 0.040 mil TPO goes over top. I got as far as mechanically fastening 2 of the 3 sheets of TPO and tacked down the rest for overnight.

Green Roof Membrane Installation Part 1

| Green Roofs | 3 Comments
About The Author
-

3 Comments

Leave a Reply to Romina Romi Cancel reply